Scaffolding application

Download an application form for permission to temporarily occupy a portion of a road for the erection of scaffolding.


A Scaffolding Protocol has been produced in consultation with Aberdeen City Council, the Health and Safety Executive (HSE) and construction professionals.

The aim of the protocol is to highlight the measures that should be taken to comply with the law during the erection and dismantling of scaffolding, with respect to protecting members of the public. The protocol does not replace any national HSE Information Sheet or HSE Guidance nor does it constitute a risk assessment or safety method statement.

The Protocol sets out a framework for contractors to adhere to in order that:

  1. dismantling and erection is properly planned;

  2. scaffolding operatives are competent and have received sufficient training and instruction on the method and sequence of work; and that
  3. there is segregation of the work, to protect the public.

You can download the complete Scaffolding Protocol from the Related Documents section below.

For more information on roadworks or street occupation

Contact us


Would you like to give feedback about the new website?