20mph Speed Limit

Aberdeen City Council has been implementing measures that will improve safety of those walking, wheeling and driving, and promoting lower driving speeds is one such measures. 20mph is already the mandatory speed limit in the core area of the city centre, new developments, areas around schools, and some residential areas.


Aberdeen City Council will now be expanding the areas covered by 20mph speed limit more widely across the city. 20mph will now be the standard speed limit on most of the roads in the built up/residential areas of Aberdeen.

Background

The Scottish Government published a ‘Scotland’s Road Safety Framework to 2030’ in February 2021. The Framework highlights The Scottish Government’s vision to have the best road safety performance in the world by 2030 and an ambitious long-term goal where no one is seriously injured or killed on Scottish roads by 2050. Through this framework, the Scottish Government aim to improve road safety and half road deaths by 2030 and achieve Vision Zero by 2050. To achieve this goal, the Scottish Government developed a national strategy for 20 mph zones and limits in Scotland. The strategy aims to expand 20mph speed limits across Scotland, and to ensure all appropriate roads in built-up areas have a safer speed limit of 20mph by 2025.

This strategy is expected to bring about:

  • a reduced perception of road danger;
  • increase the level of walking, wheeling and cycling in neighbourhoods, thereby promoting active travel;
  • improved fuel efficiency;
  • a change in social and cultural attitudes towards vehicular speed and road safety as a 20mph speed limit will be the norm in urban areas;
  • reduced collision risk and severity;
  • better air quality as there will be reduced emissions from vehicles.

Assessment criteria

To ensure consistency across the nation, the Scottish Government provided guidelines for local authorities to use in assessing their roads and to determine where the 20mph speed reduction is most appropriate.

Below are the criteria prescribed by the Scottish Government for road assessment:

a) Roads within 100m walk of an educational setting (e.g. primary, secondary, further & higher education)

b) Roads where the number of residential and/or retail premises fronting it (on one or both sides) exceeds 20 over a continuous length of between 400m - 600m.

c) Roads within 100m walk of a community centre, church, place of worship, sports facility, any hospital, GP or health centre.

d) Roads where the composition of users implies a lower speed of 20 mph will improve the conditions and facilities for vulnerable road users and other mode shift (reflect on future plans such as active and sustainable travel, places for people, consider existing and potential levels of vulnerable road users)

e) Where the road environment, surrounding environment, community and quality of life impact (e.g. severance, noise, or air quality) will be improved by implementing 20mph speed limits.

It is proposed that the speed limit in majority of the residential areas in Aberdeen will now be 20mph.

20mph speed limit assessment in Aberdeen

Aberdeen City Council employed a consultant who conducted a city-wide assessment of the roads in Aberdeen to determine where speed limit reduction to 20mph is appropriate, using the above criteria.

Following this assessment, many of the current 30mph roads within in residential areas will be reduced to 20mph.

Current situation

A permanent Speed Limit Order (SLO) has been made for 1,231 streets across Aberdeen while a Temporary Speed Limit Order (TSLO) is being made for 17 streets. To view a list of the affected streets, please refer to the relevant electoral ward below.

Electoral WardImplementation Status
Implementation has commenced
Implementation will start in November 2025
Awaiting start date
Awaiting start date
Awaiting start date
Awaiting start date
Awaiting start date
Awaiting start date
Lower Deeside115.84 KB
Awaiting start date
Awaiting start date
Awaiting start date
Awaiting start date
Awaiting start date

Please refer to the attachment below for list of streets promoted using temporary speed limit order. 

Implementation

Installation of the signs needed to amend the speed limit has commenced at the north of the city and these will be implemented on a ward-by-ward basis southwards until the changes are completed. As the signs are installed, the reduced speed limit will come into force. It is anticipated that implementation of 20mph speed limits will be completed by the end of March 2026.

The speed limit reduction was progressed using a temporary speed limit order and a permanent speed limit order.

A permanent SLO was used to promote the speed limit on roads where it is clear a 20mph speed limit is appropriate.

Certain other roads were found to meet the place criteria, or link sections of roads that meets place criteria, thereby encouraging a more consistent reduction in speed across a wider area. However, introducing 20mph speed limit on such roads is likely to be more challenging as a speed limit should be self-explaining and seek to reinforce people’s assessment of what is a safe speed to travel. For such roads, the 20mph speed limit was promoted using a TSLO.

The use of a TSLO on the roads with the characteristics stated above will give the residents time to experience the speed limit reduction, whilst giving council officers the opportunity to monitor the compliance and practicality of the 20mph speed limit.

Implementation will be done using traffic signs and road markings. No traffic calming measures are proposed within the initial scheme.

Monitoring and evaluation

Pre and post implementation vehicular speed monitoring will be conducted on strategic routes, this will help council officers determine the impact, compliance, and effectiveness of the speed reductions. Each of the roads where a 20mph speed reduction has been proposed using a TSLO will also be surveyed, and the result of the survey will be used to determine/decide whether the 20mph speed limit should be refined or modified by:

  • length;
  • introducing additional speed management measures; or used as an opportunity to implement local plans that are complemented by the lower speed limit, such as active travel measures;
  • accepting that the road is not appropriate and reverted to a speed limit of 30 mph.

The post implementation survey will be conducted following the completion of the regulatory sign installation, albeit after a period in the region of 6 months has passed, this is to provide road users and residents with the opportunity to become accustomed to the new 20mph speed limit. 

Did you find what you were looking for?

Status message

Please note, this form is anonymous, we can't reply directly to your feedback. If you would like to report an issue, make a complaint or suggestion, please Contact Us.