Access from the South Proposals (Bridge of Dee)

Committee Report Information

The Bridge of Dee Study draft STAG Part 2 report and Appraisal Summary Tables (AST) were completed in January 2017 and are available at the following links along with the report to the Communities, Housing and Infrastructure Committee in January 2017:


  Bridge of Dee, Aberdeen

These pages provide information on this key transportation project being carried out to investigate capacity issues and potential opportunities relating to the existing transport network in the Bridge of Dee area of Aberdeen. This study is currently being funded by NESTRANS, the Regional Transport partnership for the North East of Scotland.

The study follows on from a previous study, completed in May 2008, to develop options to improve traffic flows on the A90(T) Stonehaven Road and A956 Wellington Road corridor approaches to Aberdeen from the South in the short, medium and long term. In particular the previous study identified the long term need for additional capacity across the River Dee and investigation of these capacity issues will be the main focus of this present study.

Although a number of historic studies have been carried out on this issue at various times in the past, the assumptions underlying each of these studies have changed over time. While reference will be made to these studies for background understanding, this study will establish an appropriate present-day starting point. The study will be carried out using standard Government assessment methods and in particular will adopt the approach set out in the Scottish Transport Appraisal Guidance (STAG). The study will also include full engagement with Stakeholders throughout the process. For details of the STAG process please click on the following link:


For details of the identified Stakeholder groups please click on the following link:


The initial section of the study detailed in the 'STAG Pre-Appraisal' section has now been concluded and identified an agreed set of options through the Pre-Appraisal process for subsequent consideration. For details of the Pre-Appraisal process please click on the following link:


The next stage of the study as detailed in the 'Study and Methodology and Programme' section of the appraisal process considered the agreed set of options in greater detail through the STAG Part 1 process. For details of the STAG Part 1 appraisal process and documentation associated with this stage please click the following link


The current stage of the study as detailed in the 'Study and Methodology and Programme' section of the appraisal process considered the agreed set of options in greater detail through the STAG Part 2 process. For details of the STAG Part 2 appraisal process and documentation associated with this stage please click the following link:


A wide range of are available of relevance to this study. The documents reviewed are described under four broad categories of:

  1. Planning Documents;
  2. Transport Policy Documents;
  3. Previous Studies; and
  4. Other Documents


For details and links to available documents please click on the following link:


Regular updates on the progress of this study will be posted on this site. The STAG Pre-Appraisal report can be found via the link at the top of this page. Any comments on the study process can be made in writing with the heading "Bridge of Dee Study" to the address below or can alternatively be emailed to us making sure the subject heading contains the words: "Bridge of Dee Study".

For any further details contact the Infrastructure Programmes team, either by phone, e-mail or by writing to us: 

 

Contacts

  • Transportation Strategy and Programmes
    Planning and Sustainable Development
    Aberdeen City Council
    Business Hub 4
    Marischal College
    Broad Street
    Aberdeen
    AB10 1AB
    Phone: 01224 523476
    Fax: 01224 523180
    Email: programmes@aberdeencity.gov.uk